Option 1 - Key Sites Only(PDF, 8MB)
Option 1 builds on the Baseline Scenario in the draft Strategy. Option 1 focuses on the delivery of change within the West Ryde Town Centre from the redevelopment of a few key sites that are likely to be redeveloped (or ‘turn over’) in the short-medium term as the site conditions (i.e. size, location, street frontage, and dimensions), ownership, and costs make it more viable for development. It would likely result in limited and sporadic redevelopment over an uncertain and extended timeframe. However, this option responds to the community’s feedback to limit high-rise and overdevelopment, while still allowing some change and some limited place improvements (i.e. through street improvements associated with the pedestrian infrastructure adjoining the development sites).
This option is comparable to the current state of West Ryde (whilst integrating lessons learnt from the recent past) with a few larger sites (e.g. the Coles development) redeveloping on an ad hoc basis and delivering some public benefit in the town centre.
Whilst Council is aware of the community’s sentiment towards the scale and built form of the Coles site, its redevelopment resulted in the delivery of the community centre and community hall on 3-5 Anthony Road, West Ryde. The preparation of a masterplan can help Council ensure that the height and scale of buildings are better managed, whilst still encouraging some redevelopment.
Option 2 - Long Term Change(PDF, 8MB)
Option 2 translates and builds on the Incentivised Scenario in the draft Strategy. Option 2 proposes to deliver gradual change resulting in a consistent built form over the long term across the West Ryde Town Centre. This option proposes to deliver some increase in height and density on select sites to encourage greater growth and public benefit across the town centre. Due to the current development market and feasibility of development in West Ryde, it is anticipated that redevelopment would occur gradually over a long timeframe.
Under this option, development would likely first occur on the outer areas of the study area (i.e. east of the railway line) to deliver the critical mass (i.e. population) needed to trigger the redevelopment of sites within the core of the town centre. As sites slowly redevelop one by one, this will encourage change on other sites, enabling them to become feasible and further instigate growth and revitalisation of the town centre. ‘Long term’ in this option means that the masterplan would encourage some development each year over 10+ years. The result would be a more self-sufficient and vibrant Town Centre, less reliant on customers driving longer distances to the center, and less susceptible to competition from other nearby centers.
Like Option 1, this option also responds to the community’s feedback to limit high-rise and overdevelopment. This option will allow more change and place improvements than Option 1, however it would also occur over an extended timeframe. Some place improvements may not be delivered for a number of decades until the market conditions change and this scale of development is feasible to encourage renewal.
As a comparison of how a masterplan can result in development over this timescale, the masterplan undertaken in Gladesville has resulted in some sites within the Gladesville Town Centre and corridor being developed in the 10+ years since those planning controls within the masterplan were implemented. This ensured that the building stock in the area has seen some renewal, and also has funded and delivered local infrastructure upgrades such as street tree planting along Victoria Road, undergrounding of powerlines, granite paving, the small plaza at Wharf Road, the repair and renewal of the heritage clocktower, and the significant upgrade of the laneway between Coulter Street and Trim Place. This creates a critical mass over time that potentially improves development feasibility of some of the sites not initially feasible when the masterplan was first released over a decade ago.
A comparison(PDF, 1MB) has also been prepared of the two options.